The 68-meter-long and 23-meter-wide MTA TURKUAZ was constructed at the Istanbul Shipyard in Tuzla for the MTA General Management. The totally indigenous ship will start oil exploration in the Black Sea after an inauguration ceremony with the presence of Prime Minister Ahmet Davutoğlu.
Besides design and construction, which is totally indigenous, the ship incorporates technologically indigenous systems for 3D underwater searching. All equipment, tools and most of the materials were provided domestically. Moreover, scientific research equipment and the integration of the system was also completed domestically.
The vessel can conduct multipurpose research with its geologic, geophysics, hydrographic and oceanographic equipment and remotely operated underwater vehicle, or ROV robot system.
During 2014, 45 oil companies made 220 drillings in offshore and onshore Turkey, covering an area of 301 thousand square kilometers. As a result of these drillings, 188 wells were opened with a 33 percent accuracy ratio.
In early January this year, Turkish Petroleum, or TPAO, and Royal Dutch Shell signed an agreement with Globetrotter II vessel to start drilling operations in the Black Sea near Şile. The newly built Turkish drilling ship, MTA TURKUAZ, will join the exploration.
You have reported this comment as spam. Your request is being reviewed.